Matters needing attention
1. Temperature >10℃, humidity <85?? Construction in a well-ventilated environment
2. Component A must be stirred evenly before use.
3. It is strictly prohibited to mix component A, component B and water at the same time
4. The mixed paint must be used up within 0.5h
5. After construction, the tools should be washed with clean water in time
6. It is strictly prohibited to use used tools of oil-based paint to avoid pollution